Phase I 1.4 million ton project


Phase I 1.4 million ton project

The annual production of 3.1 million tons of new metal materials project by Tangshan Qianchen Metal Materials Co., Ltd. is a second entrepreneurial project implemented by Guoyi Special Steel Company during its relocation from the city. The project covers an area of 500 acres and has a planned total investment of 1.92 billion yuan. Construction in two phases: The first phase will invest 1 billion yuan and mainly build 2 850mm acid rolling production lines, 1 0.5mm-2.5mm galvanizing production line, 2 1.0mm-3.0mm galvanizing production lines, 1 2.0mm-4.0mm galvanizing production line, 2 raw material longitudinal cutting production lines, and 4 galvanizing longitudinal cutting production lines, with an annual production scale of 1.4 million tons; The second phase investment is 920 million yuan, mainly constructing one 1150mm acid rolling production line, one 0.4mm-1.2mm galvanizing production line, two 0.7mm-2.5mm galvanizing production lines, two galvanizing longitudinal cutting production lines, three black belt welded pipe production lines, and six metal hanging plating production lines, with an annual production scale of 1.7 million tons. At the same time, supporting facilities such as circulating water pump station, desalination station, acid regeneration, wastewater treatment station, air and nitrogen station, boiler room, galvanizing line flue gas denitrification system, substation, etc. will be built.

The product can be widely used in industries such as new energy vehicle frames, construction, light industry hardware, household appliances, photovoltaic brackets, power equipment, flange ducts, high-speed guardrail panels, etc.

Main features of the project:
One is the fast action of "changing cages for birds". We will adhere to the "dual pronged approach" of pollution reduction and new energy entering the city. While actively and steadily relocating enterprises out of the city, we will combine the actual situation of the enterprise and conduct market research and expert argumentation. Based on the already discontinued 74000 square meter high-speed production workshop, we will plan and implement a new metal material project with an annual output of 3.1 million tons in advance. The remaining 800 employees after the diversion of the new factory can be fully resettled, quickly forming a kinetic energy conversion and achieving rebirth.

Secondly, the pace of industrial continuity is stable. The closure and relocation of 3 steel and 4 coking enterprises in Guye District account for 50% of the district's GDP, 67% of the added value of large-scale industries, and 35% of public revenue, directly affecting 15000 people in employment. The district committee and government adhere to the general principle of seeking progress while maintaining stability, with stability as the top priority and progress as the top priority. They implement the "Six Major Industry Rise Actions" including new energy, new materials, high-quality steel, equipment manufacturing, green building materials, and modern service industries, and reconstruct a new industrial pattern for the mining area in the past century. Among them, within 2-3 years, the high-quality steel industry will form a tens of millions level steel green processing and manufacturing base supported by projects such as Qianchen Metal Materials, Juyang Metal Materials, Xuqi Photovoltaic Equipment Manufacturing, and Tianwu Tianma Precision Manufacturing. The annual output value can reach 20 billion yuan, tax revenue can reach 600 million yuan, employment can be arranged for 2000 people, and the economic "basic plate" will be stabilized with new increment, the employment "ballast stone" will be built, and the transformation "booster" will be ignited.

Thirdly, it has good ecological and environmental benefits. Adhere to ecological priority and green development, focus on implementing the goals of "low carbonization, reduction, reuse, and harmlessness", promote project implementation with the highest environmental protection standards, adopt domestic first-class secondary automation control systems and facilities and equipment such as acid regeneration, circulating water treatment, dust removal and denitrification, mist removal and purification, achieve zero emissions of waste acid, wastewater, ammonia nitrogen, and COD in the production process, ultra-low emissions of particulate matter and sulfur dioxide, with total emissions reaching 16.95 tons/year and 35.78 tons/year respectively, which is more than 20% lower than the same industry; The comprehensive energy consumption of products such as hot-dip galvanizing, metal hanging plating, and high-frequency straight seam welded pipes shall not exceed 58.19, 23.45, and 6.39 kilograms of standard coal per ton, respectively, reaching the advanced level in China.